2004-5 Pipe

 

Home

Projects

Background

2004 07 27 Heavy Rain

2004 08 30 Tropical Storm Gaston

Day 1 - Our Sandbox Toys are Bigger than Yours

Sandbox toys, day 3

Sandbox toys, day 4

Sandbox toys, 2004 12 22

Sandbox Toys, 2004 12 28

2004 12 29, More Cutting

2004 12 30 Second Cut, Headwall Starts

2005 01 03 Sandbox Toys

2005 01 04 Pipe Install

2005 01 05 Pipe Install

2005 01 06 Pipe Install

2005 01 07 Pipe Install

2005 01 10 Pipe Install

2005 01 11 Pipe Install

2005 01 12 Pipe Install

2005 01 13 Pipe Install

2005 01 17 Pipe Install, Last Sections

2005 01 18 Riprap In, Old Pipe Out

2005 01 19 Riprap In, Headwall Dig, Snow

2005 01 21 Headwall Pour Starts

2005 01 24 Headwall Forms Work

2005 01 25 Headwall Forms Work

2005 01 26 Headwall Forms Work, Headwall Poured

2005 01 27, Riprap, Drive Repaired

2005 01 28, Headwall Finished

2005 04 02 It Works

2005 04 15, Last Riprap, Grading

2005 04 18 Grout, Topsoil, Grading

2005 04 19 Topsoil, Grading, Grass

 

 

Sandbox Toys, 2004 12 28

Prev Next

Yesterday some work got done to clear out the front side of the dam, and two initial holes were drilled in the dam. It's 9 feet thick at the base.

Today our general contractor was back at work and the concrete sawing could get started in earnest.

First the back of the dam had to be exposed to the diamond cutting cable could be run through the holes.

After that was done the cutting machinery could be set up. It's basically a hydraulically operated spinning wheel, and the abrasive cable is threaded through it. The powered wheel is on a track so it can move and keep the cable taut as it cuts through the concrete. It's a pretty simple and elegant idea, although it takes some time to set up.

So cutting can start .. you can see the worthless old 24 inch pipe in this shot..

They are going to make two cuts and then attempt to knock over this large section of concrete. At 150 pounds per cubic foot I estimate it weighs about 75 tons. Once it is knocked over they are going to break it up and "lose it" under the new pipe.

If they cannot knock it over after two cuts they will make a third cut.