2004 08 30 Tropical Storm Gaston Day 1 - Our Sandbox Toys are Bigger than Yours 2004 12 30 Second Cut, Headwall Starts 2005 01 17 Pipe Install, Last Sections 2005 01 18 Riprap In, Old Pipe Out 2005 01 19 Riprap In, Headwall Dig, Snow 2005 01 21 Headwall Pour Starts 2005 01 24 Headwall Forms Work 2005 01 25 Headwall Forms Work 2005 01 26 Headwall Forms Work, Headwall Poured 2005 01 27, Riprap, Drive Repaired 2005 04 15, Last Riprap, Grading |
|
2005 04 19 Topsoil, Grading, GrassToday the rest of the topsoil was brought in, a lot more saturated dirt and debris was hauled out, and the area was seeded. Soil comes in.. Wet gunk goes out .. Raking it all out.. Lime and fertilizer .. .. and straw and seed.. .. and water .. And the same out near the street.. All the equipment leaves.. And all we're left with is the seed and straw.. The only two small pieces of work that remain are putting back the driveway edging and cementing all the interior joints in the pipe. |
|||||||||||||