2004-5 Pipe

 

Home

Projects

Background

2004 07 27 Heavy Rain

2004 08 30 Tropical Storm Gaston

Day 1 - Our Sandbox Toys are Bigger than Yours

Sandbox toys, day 3

Sandbox toys, day 4

Sandbox toys, 2004 12 22

Sandbox Toys, 2004 12 28

2004 12 29, More Cutting

2004 12 30 Second Cut, Headwall Starts

2005 01 03 Sandbox Toys

2005 01 04 Pipe Install

2005 01 05 Pipe Install

2005 01 06 Pipe Install

2005 01 07 Pipe Install

2005 01 10 Pipe Install

2005 01 11 Pipe Install

2005 01 12 Pipe Install

2005 01 13 Pipe Install

2005 01 17 Pipe Install, Last Sections

2005 01 18 Riprap In, Old Pipe Out

2005 01 19 Riprap In, Headwall Dig, Snow

2005 01 21 Headwall Pour Starts

2005 01 24 Headwall Forms Work

2005 01 25 Headwall Forms Work

2005 01 26 Headwall Forms Work, Headwall Poured

2005 01 27, Riprap, Drive Repaired

2005 01 28, Headwall Finished

2005 04 02 It Works

2005 04 15, Last Riprap, Grading

2005 04 18 Grout, Topsoil, Grading

2005 04 19 Topsoil, Grading, Grass

 

 

2005 01 13 Pipe Install

Prev Next

More pipe in the ground today. Just 3 sections, I think, and the last of the 3 was the "tee" that will have a grate at the top. The next few pics are more digging and filling. Because the space in which they can work is getting quite tight they are now putting in pipe from the low side and not the high side.

Digging..

Filling ..

Digging and filling ..

Another section goes in ..

And is surrounded with gravel. Note that the operator can work the release lever using the top edge of the trench box.

A really smelly old rotten sycamore stump is yanked out.

Digging out to move the trench box. Note that the excavator is driving on plates that were put on top of the trench box. I had been wondering what those were for. The weight of the machine is mostly on the edges of the box.

Moving the trench box.

Fetching the "tee" section of pipe. This was a lot of work to move since there were no hoist holes. They had to put one of the trench box plates inside and do a lot of improvising to move it.

Getting a coat of that nasty sealant.

A lot of gravel underneath ..

And in it goes..

This took a lot of time to get aligned and upright. But here it is..

As I write this on Friday the 14th it is (was) raining quite hard. You can see that a nice sharp cold front went through here

and it dropped quite a bit of rain. Things are sloppy outside and other than a check this morning the crew will not be doing any work today.

There are two more sections of pipe to go, and then all that remains is the riprap, the head-end structure, and then a lot of cleanup and restoration.